Install 12 x 12 deck in rear.
Philadelphia roof deck permit.
Deviation from the standard will result in revocation of this permit and imposition of further penalties.
Ez deck permit obtain permits for building a deck without submitting plans by meeting the conditions and design limitations below.
Replacement of sheathing in excess of 10 of roof area shall not be applicable to the ez permit process.
Applicant agrees to limit the construction to comply with ez permit standard for decks dated january 2011.
Total area of roof sq.
City of philadelphia office of the mayor.
While roof decks are generally by right and do not require approval from the zoning board l i will not grant a permit for this work without formal plans drawn up by an architect and the permit issued to a licensed contractor.
Residential decks up to 216 sq.
Excluding roof decks exterior window and door replacement with no change in size one or two family dwellings don t need a permit for this unless they are historic masonry facade replacement not applicable for historic properties above ground pools and spas.
Proposed area of roof sheathing replacement sq.
Deviations will require submission of plans to the department with your permit applications.
For philadelphia roof decks are for all seasons getting the proper permits from the city takes about 90 days assuming that everything goes smoothly.
Roof decks require a zoning permit.
For posternack construction typically takes about a month with more time added if the deck requires a pilot house a shed like structure with an interior staircase.
Setback roof decks must be set back at least five feet from the front building line.